Tuesday, 9 February 2016
Production update 3
We have made a lot of progress since the last production update post I submitted to my blog. We have filmed all the extra fade away shots needed to produce a fluent piece of work. The opening now includes a music backing track which helps with the professionalism of the film, the music also adds to the atmosphere in which the scene emits. We now need to include our titles and polish off the film to make it look perfect and then we will be complete! So far I am happy with the overall progress made by me and my fellow group members. I believe we have come a long way from the start and are finally seeing the nearing of the end of the production of this short film opening. We have concluded that the work is up to date in terms of footage and audio. This therefore means that the only thing left to do it the editing side of the production which shouldn't take very long at all as it is available at all times during school meaning we have plenty of time to get the work done. As well as the idents and the titles needed which is Louis' job we should also include a smooth, fluent and professional look to the short film which will involve getting rid of any imperfections and making it complete.
Labels:
abridged,
preperation,
Production Update
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Please note that all comments are moderated.